Safety Check Schedule: How to Set One Up for a Small Business

Published · gribit

Bakery owner planning safety check dates

A safety check schedule is a written plan of what you inspect, how often, who does it and where the result is recorded. In Great Britain there is no single national timetable to copy. HSE says inspection needs and frequencies should come from risk assessment, so the right schedule for a pub cellar is not the right one for a hair salon or a village hall. This guide shows how to build yours in an afternoon, what must be in it, and how to stop it slipping after the first month.

Gribit
gribit.co.uk
Keep safety checks on schedule
Gribit helps small businesses record recurring checks, manage follow-ups and keep certificates and documents together in a digital logbook.
Visit Gribit

TL;DR

  • There is no one-size UK timetable: frequencies come from your risk assessment, the manufacturer’s advice and your own experience of the premises.
  • Some inspections are tied to specific moments by law, such as before first use, when deterioration could create danger and after exceptional events.
  • Keep the schedule short enough to be done: list each check, a frequency, an owner and a place to record the result and any follow-up.
  • Records matter as much as the checks. Keep results, act on faults quickly and review intervals using what the inspections show.
  • A digital logbook turns the schedule into reminders and a searchable history, so nothing depends on one person’s memory.

Table of Contents

What a safety check schedule actually is

Think of it as a calendar with accountability. Each line answers five questions: what is checked, where, how often, by whom, and what happens when something fails. The checks can be as simple as a quick walk past the fire exits or as formal as an examination by an outside engineer.

It helps to separate three layers:

  1. Routine user checks. Quick looks by whoever uses the item or area: is the exit clear, is the cable damaged, is the first-aid box stocked.
  2. Periodic inspections. A more careful, planned look at a set interval, usually by a named, competent person.
  3. Formal examinations or tests. Specialist work by a contractor or engineer, where your risk assessment, the manufacturer or a specific rule calls for it.

Most small businesses already do some of this. What they lack is the single list that shows what is due, what is overdue and what was done last time.

What the law requires and what it leaves to you

The first thing to know is that the law rarely gives you a calendar. It gives you duties, and you decide the timing sensibly.

Equipment inspections under PUWER

Regulation 6 of the Provision and Use of Work Equipment Regulations 1998 is the main rule. HSE’s guidance on it says equipment must be inspected:

  • after installation and before first use, where safety depends on how it was installed;
  • at suitable intervals, where deterioration could create danger;
  • after exceptional events that could jeopardise safety.

The legislation itself also covers inspection after reassembly at a new location. Note the phrase “suitable intervals”. It is your job to decide what suitable means, and to be able to explain why.

Risks with their own specific rules

Some hazards have dedicated legal controls. HSE’s small-business guidance gives working at height, chemicals, machinery, gas, electricity and asbestos as examples of activities with recognised risks of harm. If any of these apply to you, check the specific rules for that hazard and build them into the schedule as fixed items rather than leaving them to guesswork.

Electrical equipment and the PAT myth

Many owners believe every plug-in appliance must be PAT tested every year. HSE says otherwise. Its guidance explains that the Electricity at Work Regulations 1989 require electrical equipment that could cause injury to be maintained safely, but do not mandate PAT, a particular test method or annual testing.

For a low-risk workplace such as an office, HSE recommends user checks before use, periodic visual inspections and risk-based testing where appropriate. Its guidance gives initial visual-inspection intervals that may range from six months to four years, and initial PAT intervals for equipment that is not double insulated from one to five years, depending on the equipment and where it is used. If you want to see how electrical checks and the paperwork around them can be organised, there is more on safety and compliance documentation.

So a sensible office entry reads something like: staff look at cables and plugs before use, the office manager does a visual walk-round at an interval your risk assessment justifies, and testing is added for items that are higher risk, such as equipment used in damp areas or that gets knocked about.

Electrical equipment and the PAT myth — overview diagram

How to set frequencies without guessing

HSE says inspection schedules should be based on risk assessment, considering how the equipment is used, how it deteriorates, the environment, manufacturer recommendations, industry advice and prior experience. That gives you a practical way to choose.

For every item on your list, ask:

  • How hard is it used? A kettle in a busy pub kitchen wears faster than one in a quiet back office.
  • What happens if it fails? A blocked fire exit has a worse outcome than a worn carpet edge, so it earns a more frequent look.
  • What does the maker say? Manuals often state service or inspection intervals. Use them as a floor.
  • Where is it kept? Damp, heat, dust, vibration and public access all shorten the sensible interval.
  • What has gone wrong before? If the same door closer fails every spring, check it more often until the cause is fixed.

Write the reasoning down in a line or two beside each interval. If an inspector or insurer asks why you check something monthly rather than yearly, the answer is already there.

A starting framework, not a rulebook

The table below shows how to think about layers for common small-premises items. The frequencies are deliberately left for you to set, because they depend on your own risk assessment and the manufacturers’ guidance.

Area Typical routine check Deeper check Who decides the interval
Fire precautions Exits and escape routes clear, extinguishers in place Alarm and emergency lighting tests, servicing by a competent person Your fire risk assessment and equipment makers
First aid Box present, in date and fully stocked Review of contents against your needs Your first-aid needs assessment
Electrical Look at plugs, cables and sockets before use Planned visual inspection, testing where risk justifies Your risk assessment, per HSE’s low-risk guidance
Work equipment Pre-use look at guards and controls Periodic inspection by a competent person PUWER regulation 6, risk assessment, manufacturer
Premises Floors, lighting, stairs, storage and housekeeping Structural or building fabric review Your risk assessment
Specialist hazards As the specific rules require As the specific rules require The relevant regulation

Build your schedule in six steps

1. List what you have

Walk each room with a notepad, or a phone. Note equipment, safety devices, escape routes and anything that could cause harm if it failed. Do it by location, because that is how you will later walk the checks. A pub has the cellar, the bar, the kitchen, the beer garden and the stairs. A village hall has the main hall, kitchen, toilets, stage and car park.

2. Pull in your risk assessments

Your schedule should follow your risk assessments, not replace them. HSE’s guidance says employers should review risk assessments regularly and whenever significant changes introduce new equipment, substances, procedures or hazards. Each new coffee machine, ladder or storage arrangement can add a line to the schedule.

3. Tailor the checklist to the item

Generic checklists find generic problems. HSE says checks should be tailored to the equipment, its use and exposure conditions, and focus on the safety-related parts needed for safe operation. For a fire door that means the closer, the seals and whether it is wedged open. It does not mean a page of unrelated questions.

For wider workplace walk-rounds, a council’s published inspection procedure suggests looking at people, processes, premises, plant and substances, plus emergency arrangements, training, risk assessments and maintenance records. It also stresses that a good inspection goes beyond ticking boxes: talk to staff, watch real work being done and look for shortcuts and abnormal conditions.

4. Assign a named, competent person

Every line needs an owner, and ideally a deputy. “Someone will do it” is how checks quietly stop. Competent does not always mean external. For routine looks it means someone who knows what good looks like and what to do if it is not. For specialist work, it means a qualified contractor.

5. Decide what happens on a fail

A schedule without a fault process is just a list of ways to discover problems and do nothing. For each check, decide who is told, what is done in the meantime and how the fix is confirmed. On electrical items HSE is direct: damaged or faulty equipment should be removed from use without delay and repaired by a competent person or disposed of. The same principle works across the board: take it out of use, then fix it, then record that you did.

6. Set the review rhythm

Intervals are not permanent. HSE’s guidance on inspection suggests reviewing intervals based on inspection history. If a check has passed cleanly for a year, you may be able to justify a longer gap. If it keeps failing, shorten it and find out why. HSE’s management guidance, HSG65, makes the same point: act on lessons learned, including from inspection reports, and revisit plans and risk assessments.

An office safety checks schedule, worked through

Here is how a ten-person office might lay it out, using the layers above. The intervals are for you to set from your own assessments.

  • Everyone, as they go: report trailing cables, blocked exits, spills and damaged plugs. Staff look at equipment before using it.
  • Office manager, planned walk-round: escape routes and fire doors, extinguishers in place, first-aid box stocked and in date, lighting, floor surfaces, storage on shelves and cupboards, display screen set-ups where relevant.
  • Electrical: planned visual inspection of portable items, with testing added for anything your risk assessment flags, such as equipment in the kitchen or items used off site.
  • Specialists: fire alarm and emergency lighting servicing, and anything else the maker or a specific rule requires, booked with a competent contractor.
  • Review: a check of the whole schedule after any office move, new equipment or incident, and otherwise at a regular point you choose.

A pub would add cellar and gas checks and kitchen equipment. A salon adds electrical tools, chemical storage and ventilation. A village hall adds stage equipment, heating, and hirers’ access. The structure stays the same.

What to record, and for how long

The check is only half the job. HSE’s guidance says you should record inspection results and keep them at least until the next inspection, and that electronic records should be secure and available to enforcing authorities on request. It also says equipment requiring inspection should not be used unless you know the inspection has taken place.

A good record has the item and location, date, who checked, the result, any fault found, the action taken and the date it was closed. Attach certificates and engineer reports to the same entry so they are not lost in an email thread.

HSG65 says businesses should record significant findings and the preventive or protective measures, making records part of the plan, do, check, act cycle. As a benchmark for retention, one council’s procedure says inspection records should include notes, checklists, post-inspection reports and action plans, and recommends keeping them for at least three years. That is one public body’s own rule, not a universal legal period, so check with your insurer and adviser what suits you.

What to record, and for how long — overview diagram

Where paper and spreadsheets let you down

The usual failure is not a bad schedule. It is a good one that nobody opens. Paper logbooks get left in the back office, spreadsheets sit on one person’s laptop, and certificates live in a drawer. When the person who “just knows” leaves, so does the system.

Three warning signs:

  • You cannot say at a glance what is overdue this week.
  • Fault follow-ups live in someone’s head or a text message.
  • Finding last year’s alarm service certificate takes a search through three places.

If any of those sound familiar, the fix is less about working harder and more about making the schedule do the nagging for you.

Perspective: why we built a logbook, not another checklist

We talk to a lot of pub managers, office administrators, salon owners and village hall volunteers, and the pattern is consistent. They are not ignoring safety. They are busy, and the paperwork is the first thing to slip. A checklist template does not fix that, because the template does not remind anyone, chase a fault or remember where the certificate went.

So our view is simple. The schedule should run itself as far as possible, so that people spend their time dealing with the cracked fire door and not hunting for the form that records it. Reminders should arrive before a check is due. A failed check should create a follow-up that stays open until someone closes it. Certificates should sit next to the check they support. And when a new member of staff takes over, the full history should be there on day one.

Tools do not replace judgement. You still decide the intervals from your risk assessment, and someone still has to walk the building. But the admin around it can be quiet and dependable, and that is where small sites gain the most.

— Jon

Keeping your schedule in one place

Gribit is a digital logbook for exactly this job. You set up recurring checks such as fire alarm tests and first-aid kit inspections, assign staff access, and receive automated reminders. Results, follow-up actions and supporting certificates and documents are stored together, organised by site, item or location, and you can export records when you need them.

Gribit

The annual plan is £49 per site for a year. If you run one shop, pub or hall, that is one subscription; a second site is a second one. You can see the details and get started on the Gribit site logbook page.

Making it stick

A few habits keep a schedule alive past the first enthusiastic month:

  • Keep it short. Twenty checks that happen beat sixty that do not. Cut anything your risk assessment cannot justify.
  • Walk it in the same order. Group checks by location so one circuit covers everything due.
  • Close the loop. A fail is not finished until the fix is confirmed and recorded.
  • Hand over properly. Name a deputy for every check so holidays and departures do not create gaps.
  • Review after change. New equipment, a layout change or an incident all mean another look at the schedule.

FAQ

How often should workplace safety checks be carried out?

There is no single answer. HSE says the frequency should be set through risk assessment, and that checks can range from pre-use and weekly looks to more extensive examinations every few months or longer. Start from the manufacturer’s advice and how heavily the item is used, then adjust using what your inspections find.

Do I have to PAT test everything every year?

No. HSE’s guidance says the Electricity at Work Regulations do not require PAT, a particular test method or annual testing. They require electrical equipment to be maintained safely. For a low-risk office, user checks, periodic visual inspections and risk-based testing are the recommended approach.

What should a safety inspection checklist include?

It should be tailored to the equipment or area, focused on the parts that matter for safe use, and informed by manufacturer recommendations. For a general walk-round, think about people, processes, premises, plant and substances, plus emergency arrangements, training and maintenance records.

How long should I keep inspection records?

HSE says to keep inspection results at least until the next inspection, with electronic records secure and available to enforcing authorities on request. Some public bodies keep them for at least three years, which is a sensible benchmark. Ask your insurer whether they expect longer.